Wausau WWTP

Vergent maintains this 130kW biogas-fueled CHP system running since 2011.
Overview

Many Midwest WWTPs Depend on Vergent

Vergent began servicing this biogas-to-electricity CHP system at Wausau’s WWTP in 2020.  One of the many Midwest WWTPs in Vergent’s operating fleet.

  • Client:
  • City of Wausau
  • Industry:
  • WWTP
  • Location:
  • Wausau, Wisconsin
  • System Size:
  • Two C65(130kW)
  • Operating Mode:
  • Grid Connect
  • Controls:
  • Unison Solutions
  • Commissioning Date:
  • 2011

Power

130 kW

Modular Bays

2

Yearly Output

1,000+ MWh

Energy Savings

$100,000 per year

Hot Water

860,000 BTU/hr