Hennepin County Home School

CHP system provided power and heating to the campus for over ten years.
Overview

Vergent Resurrects CHP System for Residential School

When Vergent took over the Midwest territory for Capstone Turbine in 2014, it brought this CHP system, which had been inoperable due to a lack of adequate maintenance, back to life.

  • Client:
  • Hennepin County
  • Industry:
  • Institutional
  • Location:
  • Minnetonka, Minnesota
  • System Size:
  • C65(65kW)
  • Operating Mode:
  • Grid Connect
  • Controls:
  • BAS
  • Commissioning Date:
  • 2003

Power

65 kW

Moving Parts

1

Yearly Output

500+ MWh

Energy Savings

$30,000 per year

Hot Water

430,000 BTU/hr