Plastics manufacturer relies on 390kW distributed energy system to reduce its high energy costs.
Overview
Off-grid generation powering utility operations
Located in the heart of Toronto, this Plastics Manufacturer was looking to fix energy costs and increase electric capacity in the plant to support the addition of future lines. This site is grid connected at 390kW of onsite generation to support operations, fix energy costs to allow for stable manufacturing costs and increase electric capacity for future phases.